Pilot Butte Power Plant Conveyance Act
Summary
Pilot Butte Power Plant Conveyance Act
This bill directs the Bureau of Reclamation to negotiate with the Midvale Irrigation District in Wyoming to enter into an agreement to convey the Pilot Butte Power Plant and its facilities from Reclamation to the irrigation district.
Lifecycle of the Bill
Introduced in House
May 14, 2025
Introduced in House
May 14, 2025
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Ways and Means, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
May 14, 2025
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Ways and Means, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
May 14, 2025